Design Build, three-Level non-ferrous recycling plant. Each level of the vibratory structure holds German Steiner equipment used to separate and convey recyclable materials into sorted units by material density readings. A dust collection system is utilized inside the plant as it is enclosed by a 70-foot metal building structure. Exterior cast in place bin walls line the side of the plant protected by 1/2″ plate steel for safe loading. The plant is enclosed by a 75 foot tall Chief metal building. 85,000 square feet of 9″ reinforced paving surround the building.