The project included improvements to the existing football and track facilities as well as the addition of a new baseball field. The natural grass football field was replaced with new synthetic turf. The existing track surfacing was replaced, and high jump, long jump, and triple jump events were added in the D-zones of the track. A baseball field was built on the old football practice field, and the infield consists of synthetic turf, while the outfield is made of natural grass.